Installation, Commissioning and Integration comprises of : BTS/BSC/ Transmission equipment installation, Commissioning of BTS / BSC / Transmission equipment, and Integration of BTS/BSC equipment.

Installation of BSC/BTS/Transmission with high standard and good quality, as instructed and standardized, following the installation binder or depends on the site situation to achieve high performance of equipments, long life time, and avoid any danger for the environment.

Commissioning BSC/BTS/Transmission service is to check all performances of equipments as a final check of installed equipments versus design/installation binder before handover to the customer or fully operated. For BSC : check installation, configuration (software and hardware,  number of TRHs, etc), connections, alarm indication, functional and performance. For transmission: check installation, capacity, configuration, and alarm indication, performance link. For Base Transceiver Station: check installation including: feeder VSWR, capacity, configuration, alarm indication, frequency cell/ARFCN (Absolute Radio Frequency Channel Number) being used, time slot, power back up system. Integration test performs integration of a BTS to the existing network to ensure the new BTS to have a good radio performance in the network.


Commissioning BSC/BTS/Transmission service is to check all performances of equipments as a final check of installed equipments versus design/installation binder before handover to the customer or fully operated. For BSC : check installation, configuration (software and hardware,  number of TRHs, etc), connections, alarm indication, functional and performance. For transmission: check installation, capacity, configuration, and alarm indication, performance link. For Base Transceiver Station: check installation including: feeder VSWR, capacity, configuration, alarm indication, frequency cell/ARFCN (Absolute Radio Frequency Channel Number) being used, time slot, power back up system. Integration test performs integration of a BTS to the existing network to ensure the new BTS to have a good radio performance in the network.